Recent Projects

Recent Projects

Just some of the successful recent projects Polylink have been involved in.

  • 2021 – South32 Bauxite Residue Disposal Areas (BRDA) Pipe Works – fabrication, supply, and on-site welding.

     

  • 2021 – Synergy Muja Power Station – MPS FAD- Cell 1 Deposition Pipework for Fly Ash Distribution Ring.

     

  • 2021 – Synergy Kwinana Power Station – WTP Supporting Pipework Project.

     

  • 2020 –  Tronox Wonnerup Mine Site – Welding of 2.6km of 225 SDR21 White Co-Ex HDPE.  Ongoing work.

     

  • 2020 – Synergy Kwinana Power Station – Common Services Piping Integration.

     

  • 2020 – Harvey Beef – Supply, Installation and Commissioning of the new Covered Anaerobic Lagoon.

     

  • 2019 – Geographe Civil – Supply and Installation of Launders, Pipework, Valves, and associated Fittings for the Dardanup Landfill Waste Facility MIC Phase 2.

     

  • 2019 – Millennium Minerals Nullagine – Supply and Installation of Tailings Dam Pipework and associated Fittings. Supply and Installation of 20km of Bore Lines plus Supply of Head Works, Meters, Valves and Solar Pumps

     

  • 2018 – Downer EDI Engineering Power – Supply and Installation of 450mm Fire Line at Muja Power Station Collie.

     

  • 2018 – TW Power Services – Supply and Installation of Fire Ring Main Upgrade at Collie Power Station.

     

  • 2018 – Image Resources NL – Supply and Installation of Pipework for the Boonanarring Mineral Sands Mine.

     

  • 2018 – Keysbrook Leucoxene – Upgrade – Design, Supply, and Installation of Trommel, Wet Concentrator and Process Pipework.

     

  • 2017 – Georgiou Group – Installation and Underground Services Pipework for Kwinana Tianqui Lithium Project Stage 1 and 2.

     

  • 2017 – Doral Minerals Sands – Supply and Installation of Outfield Piping for the Yoongarillup Mineral Sands Concentrator.

     

  • 2017 – Horizon West Landscaping – Supply and Installation of Below Ground Mainlines for the new Perth Stadium.

     

  • 2016 – Horizon West Landscaping – Supply and Installation of 8.3km of HDPE Pipe ranging from 90mm to 315mm for the Belmont Racecourse.  Supply and Installation of Grundfos MPC Pump Unit an associated Filtration.